Affichage de 6322 résultats

Description archivistique
1926 résultats avec objets numériques Afficher les résultats avec des objets numériques
Plans of the Tower Block
LSBU/2/2/8/5 · Dossier · 1964-2013
Fait partie de London South Bank University

The Tower, Metal, Extension and Joseph Lancaster Blocks were built together and so the plans were drawn up simultaneously and kept together. Thus this file comprises plans of the Tower Block from 1964-2013 and also plans of the other blocks up until 2005. Post-2005 plans for the other Blocks can be found in files LSBU/2/2/8/16-18.

Sans titre
Plans of New Kent Road
LSBU/2/2/8/21 · Dossier · 1907-2012
Fait partie de London South Bank University

Comprises plans of the building predominantly covering the refurbishment work 1989-1990. There are 46 hard copy plans (1907-1990) and 86 digital plans (2007-2012).

Sans titre
Plans of Dante Road
LSBU/2/2/8/22 · Dossier · 1992-2012
Fait partie de London South Bank University

Comprises 63 hard copy plans from the construction of all three phases of the halls (1992-1994) and 70 digital maintenance plans.

Sans titre
LSBU/2/2/5 · Dossier · 1948-1964
Fait partie de London South Bank University

Comprises:

  • First report on complete Island-site scheme, October 1948

  • A report submitted to members of the Governing Body on suggestions for the development of the Polytechnic: it covers developments of courses offered, the structure of departments and accommodation and premises, c.1957.

  • A Scheme for the Future Development of the Polytechnic: a report setting out the desired development of the Polytechnic in terms of teaching, accommodation, buildings and amenities, 1957.

  • The Development of the Borough Polytechnic: a progress report looking at the Governors' 1957 Scheme of Development and the progress made, October 1960.

  • A report for London County Council detailing approximate estimates of cost, initial cost plans and a comparison of schedule areas with plan areas, April 1964.

  • Report to the Governors Building Sub-Committee: a report on the development of the Tower and Extension Blocks including architectural plans by Norman and Dawbarn, Juy 1964.

  • Schedule of Accommodation in Existing Buildings and Proposed Extension: a table of rooms, their functions, their area in square feet and maximum student capacity, October 1964.

Sans titre
Borough Polytechnic Extension Stage 2
LSBU/2/2/7 · Pièce · October 1963
Fait partie de London South Bank University

Comprises a report on a preliminary block plan scheme for an extension between Borough Road Building and the National College (what is now the Tower and Extension Blocks) and architectural drawings showing the layout of the extension.

Sans titre
South Bank Technopark
LSBU/2/2/9 · Dossier · 1981-1985
Fait partie de London South Bank University

Comprises:

  • Correspondence regarding the proposed development, 1981

  • Correspondence and papers regarding the planning proposal and public enquiry, 1982-83

  • Southbank Technopark Limited Directors' Reports and Accounts 1982 and 1983

  • Information packs for prospective tenants, c.1985

  • Publicity material regarding the building and its services and facilities c.1985

Sans titre
LSBU/2/2/14 · Pièce · June 2006
Fait partie de London South Bank University

A report on the Southwark Campus highlighting potential improvements. It provides contextual information on the University, the surrounding area, planning and regeneration in London and future requirements for University buildings.

Sans titre
LSBU/2/2/15 · Dossier · 1968-1969
Fait partie de London South Bank University

Correspondence, notes, schedules, programmes, invitations, seating plans, minutes and press releases regarding the arrangements for officially opening the Polytechnic's new extension buildings on 9 July 1969 by The Duke of Edinburgh. Contains letters from James Orr C.V.O., The Duke of Edinburgh's private secretary.

Sans titre
PS/2/2 · Dossier · June - November 1998
Fait partie de Professor Pam Smith research

Transcripts for focus groups of students and staff in Basingstoke, Portsmouth, Bristol and Southampton. Questions on the value of health promotion, what student nurses should be doing on placements, how it should be assessed.

PS/2/5 · Dossier · August 1998
Fait partie de Professor Pam Smith research

Project Commissioned by the NHS Executive, South & West. Carried out by SBU Faculty of Health.
Project team: Pam Smith, Pam Schickler, Abigail Masterson, Trudi James, Gillian Jordan, Carolyn Roth, Deborah Conroy, Sandy Emery, Mary Lovegrove
Two copies of the final report, plus a copy of the appendices bound separately

Sans titre