Comprises images of the redevelopment work from August 2012 to September 2013.
Sin títuloThe Tower, Metal, Extension and Joseph Lancaster Blocks were built together and so the plans were drawn up simultaneously and kept together. Thus this file comprises plans of the Tower Block from 1964-2013 and also plans of the other blocks up until 2005. Post-2005 plans for the other Blocks can be found in files LSBU/2/2/8/16-18.
Sin títuloComprises floor plans of the Vickers Building and plans for the George Overend Building.
Sin títuloComprises floor plans and elevations for Ingall House.
Sin títuloComprises digital plans for all floors of Metal Block.
Sin títuloComprises plans of the building predominantly covering the refurbishment work 1989-1990. There are 46 hard copy plans (1907-1990) and 86 digital plans (2007-2012).
Sin títuloComprises 63 hard copy plans from the construction of all three phases of the halls (1992-1994) and 70 digital maintenance plans.
Sin títuloComprises:
-
First report on complete Island-site scheme, October 1948
-
A report submitted to members of the Governing Body on suggestions for the development of the Polytechnic: it covers developments of courses offered, the structure of departments and accommodation and premises, c.1957.
-
A Scheme for the Future Development of the Polytechnic: a report setting out the desired development of the Polytechnic in terms of teaching, accommodation, buildings and amenities, 1957.
-
The Development of the Borough Polytechnic: a progress report looking at the Governors' 1957 Scheme of Development and the progress made, October 1960.
-
A report for London County Council detailing approximate estimates of cost, initial cost plans and a comparison of schedule areas with plan areas, April 1964.
-
Report to the Governors Building Sub-Committee: a report on the development of the Tower and Extension Blocks including architectural plans by Norman and Dawbarn, Juy 1964.
-
Schedule of Accommodation in Existing Buildings and Proposed Extension: a table of rooms, their functions, their area in square feet and maximum student capacity, October 1964.
Comprises a report on a preliminary block plan scheme for an extension between Borough Road Building and the National College (what is now the Tower and Extension Blocks) and architectural drawings showing the layout of the extension.
Sin títuloComprises:
-
Correspondence regarding the proposed development, 1981
-
Correspondence and papers regarding the planning proposal and public enquiry, 1982-83
-
Southbank Technopark Limited Directors' Reports and Accounts 1982 and 1983
-
Information packs for prospective tenants, c.1985
-
Publicity material regarding the building and its services and facilities c.1985
A report on the Southwark Campus highlighting potential improvements. It provides contextual information on the University, the surrounding area, planning and regeneration in London and future requirements for University buildings.
Sin títuloCorrespondence, notes, schedules, programmes, invitations, seating plans, minutes and press releases regarding the arrangements for officially opening the Polytechnic's new extension buildings on 9 July 1969 by The Duke of Edinburgh. Contains letters from James Orr C.V.O., The Duke of Edinburgh's private secretary.
Sin títuloBooklet advertising the conference facilities available in the Keyworth building.
Sin títuloFold-out leaflet about the new K2 building.
Sin títuloReport into the property, including development proposals, tenure and tenancies, valuation and plans.
Sin títuloPresentation slides, notes on focus group interview schedule. Floppy disk. Copies of emails about the presentation. For 3rd European Nursing Congress, 5-8 October 2003.
Sin títuloInformation Sheets, copies of the questionnaire, correspondence relating to project administration
Transcripts for focus groups of students and staff in Basingstoke, Portsmouth, Bristol and Southampton. Questions on the value of health promotion, what student nurses should be doing on placements, how it should be assessed.
Notes on the focus groups and reflections on the experience of running them. Also includes some additional transcripts.
Project Commissioned by the NHS Executive, South & West. Carried out by SBU Faculty of Health.
Project team: Pam Smith, Pam Schickler, Abigail Masterson, Trudi James, Gillian Jordan, Carolyn Roth, Deborah Conroy, Sandy Emery, Mary Lovegrove
Two copies of the final report, plus a copy of the appendices bound separately